Jp¥online 繁中简中EN2026/07/11

Waita No.2 Geothermal Plant Shifts to FIP SchemeA · FULL TRANSLATION

Source: PR TIMES· Published: 2026/07/11 05:10 JST· Section: INDUSTRY & SUPPLY CHAIN
# geothermal# FIP# renewable energy
Key Points
  • The Waita No.2 geothermal plant moves to the FIP scheme
  • Advanced through local-business collaboration
  • Geothermal is a long-run theme for energy self-sufficiency
Analysis

Geothermal is one of Japan's few home-grown steady green-power sources. The Waita No.2 plant is shifting to the FIP scheme via local-business collaboration — a step forward in the policy and business model for geothermal, relevant to Japan's energy transition and regional co-existence.

Read the original (PR TIMES) → ← Back to home